Hi All,

I have a scenario for configuring holiday calendar.

we have ministerial and technical staff.

2nd and 4th saturdays are applicable to only ministerial staff. but every department has ministerial staff. i am unable to group them at personnel subarea grouping level.

how to solve this problem?

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 06:59 AM

    Hi,

    This you have to do via Employee Subgroup Grouping.. and you have to create WSR accordingly...

    Regards,

    Kapil Kaushal

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 07:02 AM

    Hi,

    If EE groups are what that differentiates ministerial staff from technical staff, then you can use different groupings at EE subgroup groupings.

    Check this:

    SPRO -> Time management -> Work Schedules -> Work Schedule Rules and work schedules -> Define Employee subgroup groupings

    - Suresh

    Edited by: SURESH on Dec 22, 2008 12:33 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Suresh/Kapil,

      Thanks for the quick reply.

      I'm using different EE groupings for ministerial and technical staff but how can i differentiate at PSA grouping leve, because i can't assign 2 holiday calendar to a Personnal subarea grouping.

  • Posted on Dec 22, 2008 at 07:07 AM

    check

    V_503_All if it is E and ESG grouping

    V_001P_All if it is PA and PSA grouping thru SM30

    let me check ur scenario once

    Edited by: Sikindar on Dec 22, 2008 12:38 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Sikindar T

      Hi,

      I have assigned holiday calendar department wise but in each department there are Ministerial staff.

      Here my question is can we use only 1 holiday calendar which caters all the needa?

      Needs are:

      1. Ministerial staff has to get 2nd &4th saturdays as Off/Paid.

      2. Others ESGs has to get Work/Paid.

      Please let me know if you still need clarity on this. I have tried the ways which I knew.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.