RESERVATIONS

Hi,

I want to know, can we reflect the reservation for a perticular material in the purchase order for that material.Means when i see the PO for that material ,i should have to see the corresponding reservation for the same.

Hoping reply earilier.

Thanking you,

Manish.

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 05:52 AM

    HI,

    u enhance the requirement..

    basically there is no link between reservation and PO.. but for ur business requirment

    may b tracking number field in the PO can b used.maintain the reservation number in the tracking fields of the PO

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 06:59 AM

    Hi,

    The list of reservations based on materials will be given by using t-code : MB25

    Thanks & Regards,

    VB

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member manish bachate

      Hi,

      You can control the material procurement based on the planning file entry.

      I.e. You can plan based on the reservation,as it is a form of requirement and it will be considered for planning if a shortage exists for your material.

      Regards,

      Deepak.

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 08:46 AM

    Hi Manish,

    In ME21n-Environment-Material Stocks-Now the MMBE screen appear.Here you can see the reservaed quanity of the material.

    If you see the reservation details, in the same screen-environment-reservations-now the list of reservations appear-double click on the reservation you want to see.

    Hope this will be helpful to you.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 23, 2008 at 07:00 AM

    ok!

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 07:06 AM

    Hi,

    There is not any direct linkage between PO and reservations as the relationship is many-to-one (i.e. one PO line item is a combination of several reservations). Yet, for verification purpose, end users can be able to check in MD04 transaction (stock/requirements list) where it is feasible to get a due understanding of why PO was generated.

    Cheers,

    HT

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2008 at 07:07 AM

    Hi,

    There is not any direct linkage between PO and reservations as the relationship is many-to-one (i.e. one PO line item is a combination of several reservations). Yet, for verification purpose, end users can be able to check in MD04 transaction (stock/requirements list) where it is feasible to get a due understanding of why PO was generated.

    Cheers,

    HT

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.