Skip to Content
0
Former Member
Dec 22, 2008 at 06:46 AM

Coping of MRP materials and MRP settings from one storage location to other

30 Views

HI,

We have created a new storage location and now need to extend all MRP materials from old storage location to new one and also assign same MRP settings to new storage location (same as old sto loc.)

PLease guide the steps for doing these two requirements.

Thanks

Rohit Chavan