I Have done a Rework Order with all the steps

First i create a Reference op set in tcode Ca11.

Enter the plant, Description, usage and status

for the ref op set

Enter lot size and unit of measure.

Enter the op as 0010 / work center/op control

key/Description for the op

Enter the standard values and save.

2. Create a Standard trigger point in CO31.

Enter the Trigger Point usage /Group as FERT.

3. Tick the Trigger Point Functions.

4. Enable the indicator create order with Reference.

5. Enter the system status as PCNF.

6. Enter change as +.

7. Enable the indicator once.

8. Now place the cursor on the create order with reference.

9. Go to Parameters.

10. In the Parameter enter in the group the created Reference op set group no.

11. Order type as PP01 and group counter as 1 and save the Trigger Point.

12. Now go to the Routing for your Material.

13. Choose the last op to assign the Trigger point.

14 .Select the OP -


> Go to ---> Trigger Point overview.

15. Enter the Trigger Point usage as FERT.

16. Now choose that line, select the Details---> Trigger Point

17. The system will say standard trigger point exists from which you can

select the created Trigger Point (EXx Production) and save.

18. MD02/MD04.

19. Convert the Planned Order into Production Order and Release the order.

20. Now confirm the ops.

21. For the last op enter the yield and rework qty

and set the status as PCNF.

22. If the status of last op is PCNF then in the

system a POP UP will appear as Activated by

Trigger Point /Create order with reference/order

number/sequence and op number which trigger point

works and enter.

Till this is step i found ok but when the confirmation had happened for the last step , the automatic order should be created for rework and that number is like next to the original order but no rework order is created automatically could any one tell me did i miss any step or what is the procedure..and were do i fine the list of rework orders..Thanks in advance..

sravanthi

Edited by: sravanthi nemani on Dec 22, 2008 7:21 AM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 07:14 AM

    HI

    1) Create Routing CA01

    2) Create Rate Routing with control Key as Rework Control Key CA11

    3) Create trigger Point CO31

    Trigger point usage 0004

    Tick triger point function

    Tick order with Reference

    System status "CNF"

    Change " - "

    Active " 2 "

    A popup screen appears

    enter Rate routing number

    Group counter

    Enter Main order Type(eg :PP01)

    save

    go to Routing

    select the perticular operation

    select main menu GOTO

    Click on trigger point overview

    Enter trigger point

    Save the order

    Confirmation of the order

    u have to enter the rework order quantity and confirmed quantity

    then at the time of saving the order it will ask u u wnat to execute trigger point

    if u press Yes the perticular quanity u have menationed for rework it will go to rework, u go to COOIS. Enter order type as PP03 Rework order type and execute , u will find order number next to the main order , u confime the Rework order and confim the main order once the rework order has been confimred.

    i hope this i will help

    Madhu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.