Hi Gurus,

MRP run is taken against sales order and subcontracting PR is generated with referance to that PR subcontracting PO is created, in components there are four material and against this component special Stock Indicator E is there.

Now I want to transfer material to vendor through MB1B with referance to PO.

when I enter PO and movement type 541 no material is coming.

Please advice.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 20, 2008 at 07:03 AM

    You create one stroge location like SC01 and Issue the material using the mvt type 311(loc to loc) or 301 plt to plt wherever the location is sitted. We are using this method for good issue to subcontracting. Finally using 231 mvt type make consumption entry from SC01.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.