Hi Guys,

I am able to view long term planning planned orders in CM38 , but this planned orders are not displayed in CM22 , i am not able to see this requirement , only production orders of operational planning are displayed .

Please through your views on this.

I want to do capacity levelling for long term planning at planned order stage.

Thanks and regards

Thamizhchelvan G

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 20, 2008 at 06:44 AM

    Dear,

    Please check this

    In MD02-- Scheduling parameter as 2- lead time scheduling.

    T.code OPU5 - Specify scheduling Parameter.

    In Detail Scheduling Tab:- You have to tick Generate Capacity Requirement.

    Work center in capacity tap mark for Finite scheduling and long term planning for work center.

    In CM22 check your time profile SAP_Z004 by pressing F7 and select exact selection parameter.

    Regaads,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.