costing in rem scenario

Hai gurus,

i have one small problem in rem costing.

1) i am having the job flow as Roh to halb to fert.

2) I had initially done standard cost estimate for fert using T.C CK11n and CK24, on doing this

cost is updated in costing view 2 under future cost.

3) The problem now is ,when i am doing MFBF for the fert the system through the error as

" No active standard cost estimate exist".

NOTE;

i had already done standard cost estimate for halb and also done MFBF for halb and the required qty

is available at storage location.

waiting for the positive feed back.

with regards,

sekar chand

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Dec 20, 2008 at 06:23 AM

    Dear,

    This error is dur to there is no standard cost estimate for current period of material.

    I think u have not released the Std cost for Current period.

    1. in CK11N , please ensure that the cost estimate is without errors (check the log and ensure that green colour light is turned on).

    2. In CK24 , first mark the estimate.( ensure that the costing variant used in CK11N is the same used here for marking also) .Once the estimate is marked (check the status: Marked without errors)

    then , release the estimate.(check the status: Released without errors)

    3. Now check whether the price has been updated in Material master , in Costing2 view. (Only when mark & release is successful in CK24 , the price will be updated here).

    Or for all material go ahead with CK40N

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 20, 2008 at 06:59 AM

    Dear Sekar Chand,

    The error shows you have marked the cost estimate successfully,but not released it properly.

    So execute CK24 and enter the material,plant and click on the button for mark(show that in the top you

    are able to see release button is displayed).

    Once after executing this you can see the cost appearning under Current std.cost estimate column.

    Then check in MFBF.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.