Dear Expert,

Can you tell me possibility of Back flushing for Serialize Materials & Automatic Good Receipt (GR) for serialized Materials in Discrete Manufacturing?

If possible pls tell me solution for this.

Regards,

Dev

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 19, 2008 at 11:13 AM

    Dear Dev,

    Backflushing of Serialized components is not possible because standard SAP system doesn't allow backflushing of materials which are assigned serial numbers.

    Further, you can have Auto GR setting in Production Schedulling profile in OPKP.

    You need to assign the same profile in Work Scheduling view in Material Master.

    HOpe this helps.

    Revert if any doubt.

    Regards,

    Tejas

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.