I am in the chemical processing industry and I have a single operation in my order to create a batch of semi-finished product. The duration is the same regardless of the batch size used in the order. i.e 48 hours to make 500kg or 2500kg.

Which capacity formula settings should I use for these resources?

Tks

R

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 19, 2008 at 10:32 AM

    Hi,

    Please go to OP17 & create a Formula Parameter for Work Center (eg: ZSAP02) . Then go to OP21 & define a Formula for Work Center, inside this define the formula as = ZSAP02, tick the appropriate indicators & save.

    This newly created formula can then be used in the resource.

    Regards,

    Subha.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 23, 2008 at 12:04 PM

    hai,

    because irrespective of base qty , your m/c duration is 48 hours,

    in formula or sheduling you can give only duration . so in formula op21, give the duration activity which have been created through op7b.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.