cancel
Showing results for 
Search instead for 
Did you mean: 

Execution of Report in Background (F9)

Former Member
0 Kudos

Hi Gurus,

If we execute a report in background (F9), and we give some future date and time, so does this mean schedulling a report?

If i schedule a report for Monday on friday, so will system start to run a report on monday or it will run on friday and show the data on monday?

Please revert asap.

Thank You

Accepted Solutions (1)

Accepted Solutions (1)

former_member193516
Active Contributor
0 Kudos

Hi,

- system will show scheduled report at all time in the system

- run time is only Monday if you schedule for Monday

- check SM37 for that

Cheers

Hein

P.S. If helpful check this out:

https://www.sdn.sap.com/irj/scn/index?rid=/webcontent/uuid/007928c5-c4ef-2a10-d9a3-8109ae621a82

Answers (1)

Answers (1)

Former Member
0 Kudos

Dear !

Background jobs are based on either immidiate basis or scheduling basis. If that you need after one week,you can schedule today with date of next week end. There is filed sch.start date and time.

Also you can run same job on weekly basis and period basis click period tab and assign your day / period.

Best Rgds

ManiKumar