Skip to Content
author's profile photo Former Member
Former Member

Dynamic re

Scenario is A -> XI -> B. And BPM is in place. A is a non SAP system and B is a SAP system.

When ever the message gets failed in BPM it should send Email notification to Sender system A.

In that Email notifcation I want my SAP system name(B) which may dynamic.

How can I read System B name when BPM is sending mail to System A.

Please help me here.

Regards,

Naresh

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 02:55 PM

    Naresh,

    here there are two Issues.

    1) You cannot determine using BPM which message has sucessfully processes and which one not.

    2) The sucess or failure of message is Known only when the complete end to end process completes.

    I feel You can create an ALERT category and Perform this Operation ...

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.