Skip to Content
avatar image
Former Member

Replenishment job(LP21)

Hello,

I am facing an issue with RLLLNACH1 (replenishment job using LP21).

It is not creating the TR and job is getting complete but showing this message in log.

(Replenishment method 1 set in storage type. See long text

Message no. LP325) , whereas message type is W.

Date Time Message text Message class Message no. Message type

18.12.2008 11:00:05 Job started 00 516 S

18.12.2008 11:00:05 Step 001 started (program RLLNACH1, variant TEST-REPLMNT, user ID CPS) 00 550 S

18.12.2008 11:00:05 Replenishment method 1 set in storage type. See long text LP 325 W

18.12.2008 11:00:05 Job finished 00 517 S

Any idea, to create the TR.

Regards,

JPS

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Dec 18, 2008 at 01:50 PM

    Hello,

    just see long text for LP325 warning message and you will get the answer:

    Diagnosis

    In the storage location, the replenishment technique 1 is set. This means that the replenishment takes place directly for TO confirmation per transfer order, if the minimum quantity is fallen short of. As a result, open transport requirements are not taken into consideration.

    You start the replenishment report, which is scheduled if no special replenishment technique is set for the storage type. This replenishment report generates transport requirements, which, however, are not taken into account for automatic replenishment from transfer order confirmation. Therefore, it can happen that, in total, too much replenishment is requested for individual storage bins.

    Procedure

    Check whether you have entered the correct storage type.

    Andrzej

    Add comment
    10|10000 characters needed characters exceeded