REM COMPNENT AND ASSEMBLY BACK FLUSH

Dear gurus,

I have the BOM as Fert (A) in st.loc 1000, Halb (B) in st.Loc 1000 and Roh (C) in St.Loc 2000.

1) After Mrp run i had converted pur req of Roh to P.O and done Migo.

2) i had done MF60 using Halb pld order and during this process i had given rep st.loc as 1000,

so the Roh (X) qty is reserved against st.loc 1000.

3) But when i done MFBF for Halb using component backflush i am getting error as

"Deficit of St.Loc un restricted use of X qty- For Roh (c) in St.Loc 2000".

Pls suggest the answers for the same.

with regards,

sekar chand

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Dec 18, 2008 at 12:11 PM

    Dear Sekar Chand,

    The error shows that there's no sufficient stock of material X in the storage location 2000.

    1.See while executing MF60,under global settings is the indicator for Stock transfer reservation is

    included or not?If it's included means then a stock transfer servation will get generated and this number

    you will get it in MB25.

    2.Using this reservation number once after physical transfer of material happens you can execute MF65

    based on this reservation number or even using MB1B.

    3.If you are not including the check box then a direct transfer of material happens.

    Create stock transfer reservation

    Creates stock transfer reservations for the required components when staging materials at storage

    location level.

    When using stock transfer reservations, the system reserves the required components at the

    replenishing storage location. The goods movement can be posted in a separate step and is, therefore,

    not carried out until the goods movement has actually taken place.

    If you do not select this field, the system directly transfers the components.

    So only after carrying out MF65 or MB1B,sufficient material of X will be available for backflush when

    posting for the HALB.

    So if you want to do transfer posting of X from one storage location to your prod.storage location (for

    backflush) there's must be sufficient stock in the issuing storage location.

    Tell me why do use component backflush?

    Regards

    Mangalraj.s

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.