Skip to Content
author's profile photo Former Member
Former Member

Post good issue error

When i try to post configurable material i get error.

Sales order stock 3845 001000 does not exist

How can i create a sales order stock?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 10:20 AM

    Hi

    I hope,your configurable material has not been received by you in your Plant and storage location, that is why you are getting the error.

    So, receive the material in your Plant and storage location through MB1C.

    Put your Plant , storage location, movement type- 561, specia; stock indicator- E,press enter.

    In the next screen, enter your material number and quantity , save it.

    Now, to confirm check with MMBE(stock overview) for your material number in your Plant and Storage location.

    You will find the stock under Sales order stock in your Plant.

    Now stock is received by SD department and you can post goods issue for this.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 18, 2008 at 09:59 AM

    Hi

    Go to MB1C ,

    Enter Movement type 561

    Plant : XXXX

    Storage Loc :XXXX

    Right side you find special stock indicator there put E .

    Then Press enter ,

    specify sales order number and line item , material and quantity. then click on save.

    then try to do PGI.

    Hope it helps

    Regards

    Ramesh.

    Edited by: Ramesh on Dec 18, 2008 11:00 AM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 10:15 AM

    Hi,

    From error it looks like you are MTO process.

    First go to MMBE and check the stock of the material.

    If material is not available then go to MB1C and use these information

    Movement type 561 E.

    Plant in which you want to store the material.

    Storage location which you have maintained for that plant.

    Save the data and try to do PGI again.

    Hope so this will solve your problem

    Regards

    Raj.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 10:16 AM

    Hi,

    From error it looks like you are MTO process.

    First go to MMBE and check the stock of the material.

    If material is not available then go to MB1C and use these information

    Movement type 561 E.

    Plant in which you want to store the material.

    Storage location which you have maintained for that plant.

    Save the data and try to do PGI again.

    Hope so this will solve your problem

    Regards

    Raj.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.