CK11N and Production order problems

Dear all

I have done cost estimation for a product and but the Activity cost are not coming in cost estimate but iam able to see the routing number in Valuation fields. While creating & Release production order for that material, i am not geting the activity prices in that plan column how ever when i have done confirmation for that order, the actual amounts are debited to that order.

Please let me know where is the error or i am missing some configuration.

Thanks

Ansuman

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 10:01 AM

    Please check the activity price maintenance in KP26. If you have not mentioned there as manually, ensure that you run KSPI for price calculation based on the planned activity capacity and the cost centre costs.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 03:36 PM

    Hi, check material master data, Plant data.set indicator Produced. If it's ok check C223, CS03, or Mixing ratio

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.