Dear Experts,

How to change Dyn modification rule from Charac. level to lot level??

Reg,

RPV.

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Hi

Also once you do the change in the inspection plan. Create another lot and give the usage decision. QDl3 will get updated qutomatically

Regards

gajesh

Answers (1)

Answers (1)

former_member186399
Active Contributor
0 Kudos

Dear vele,

DMR can be either at lot creation level or at usage decision level which can be changed in QDR2.

Whether DMR has to be at lot level or character level or at inspection type level depends on how you assign it in inspection plan.

Please go to inspection plan and go to the header and change the dmr level from character level to lot level. this will not be seen inQDR3

Please go through the below

You have the following options:

Lot-based dynamic modification at the level of the material and inspection type

The decision concerning the next inspection stage is made dependent on the inspection lot valuation. The dynamic modification rule is defined in the inspection type for the material. An inspection plan is not required. However, if you inspect with a task list, you can maintain a quality level for each inspection type, even if the same task list is already used.

Lot-based dynamic modification at the level of the material and task list

The decision concerning the next inspection stage is made dependent on the inspection lot valuation.

The dynamic modification rule is defined in the task list header; the rule then applies to all inspection characteristics.

Characteristic-based dynamic modification at the level of the material and inspection plan characteristic

The decision concerning the next inspection stage is made dependent on the inspection characteristic valuation.The dynamic modification rule is defined in the task list for the inspection characteristic. You have the following options for assigning a dynamic modification rule:

You define dynamic modification rules in the inspection characteristics for the task list.

You define numbers of controlling characteristics in the inspection characteristics for the task list to which you have assigned a dynamic modification.

You enter a dynamic modification rule in the task list header. This appears as a default value when you add inspection characteristics in the task list.

Revert back with your exact requirement

Regards

gajesh