Create Product Cost Collector for Order Type PP01

Hi Gurus

I want to create Product Cost COllector for order type PP01, but only RM01 order type is considered in Product Cost Collector creation screen.

I have already maintained settings in OTDP for PP01 for Product Cost COllector.

How can i bring PP01 order type in product cost collector screen?

Thanks in Advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Dec 18, 2008 at 11:21 AM

    Hello Ansal ,

    If you want to create PCC with order type u need to do the following :

    1.Goto T-Code : KOT2_PKOSA where u will define the Order type(PP01 like RM01/CO01) for Product Cost Collector (Controlling --Product Cost Controling ) with all the parametrs like Functional Area , Controling Indicators , Planning Profile , Settlement Profile etc .

    2.U need to tick on the Check Box : Cost Collector under Controlling tab in OPL8

    3.U should maintain Production Version at MRP4 of the material .

    Now goto KKF6N and create Product cost collector with Order type PP01

    Hope this will solve the problem

    Regards

    Jia

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 09:58 AM

    Hi

    In OPL8 select the cost collector indicator box and set default rule- periodic settlement (pp2) of the order type PP01.

    Then you need run the standard cost estimate with transaction ck11n

    Then you need to create product cost collector in transaction kkf6n

    Thanks

    Saravana

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 18, 2008 at 10:09 AM

    Hi,

    Go to OLP8 (transaction for order control parameter) and choose PP01 for u r plant. In controlling tab check the cost collector indicator which allows the PCC for order type.

    Shekhar

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Anish Bansal,

      1.If you want to use a product cost collector for a production order for capturing the order costs,first for

      the respective order type you have to include the check box for Product cost collector under controlling

      in T Code OPL8.

      2.You require a production version before creating a product cost collector.

      3.Then in T Code SPRO->controlling->Cost object controlling>Product cost by period>Product

      cost collectors>Define Order types->you have to create a new order type-->with an order category 5 -

      Product cost collector,you can define as per wish say for EG,CO01.(instead of this you can give as

      PP01).But this same one say PP01 is to be used for any material for using PCC as a cost object and

      has to be used irrepective of its production order type.

      check and revert back.

      Regards

      Mangalraj.S

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.