release strategy

hi all

in case of release strategy what is the meaning of release indicator and what is meant by changeable indicator 1 to 6 . please tell me function of these changeable release 1 to6 in laymen .

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 08:03 AM

    Hi

    Release ID ( indicator) Specifies whether the purchasing document can be processed in or is blocked for follow-on functions .these indicator you will find in the release stragey in the Release status where you will define the matrix ( Example

    No one release the document then the release stauts will be B

    if the P1 release the document then the stauts will be B

    Both P1 and P2 release the document then document will be having final release.

    *P1 P2* Release indicator

    B Blocked, changeable with value

    B Blocked, changeable with value

    G Released

    Release ID Changeable % value change Descriptin

    B 4 10,0 Blocked, changeable with value

    G 2 40,0 Released

    R 1 Released, no changes

    Changeability : how the system reacts if an internal or external purchasing document is changed after the start of the release procedure.

    Note Values 1 to 4 apply to internal purchasing documents (purchase requisitions)

    Values 1 to 6 to external purchasing documents.

    1- means that the document once release cannot be change by the user,

    2- Changable but no new release strategy will be determined

    similarly other chanability value behaves differently

    Value Change:

    Tolerance for Value Changes During Release ( that is the % by which you can change the Purchase docuement after the release has begun)

    If the new value exceeds the old value by more than the percentage entered, the system issues an error message.

    hope you will get the understanding

    Sunny

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 07:53 AM

    1 Cannot be changed

    If you set this Release Indicator You cannot Change the Purchase Order once it is Released. Whenever you try to Change the po in ME22N it will be in Display mode only and Throw Error Message Like PO is already Released, Changes Not Possible.

    2 Changeable, no new determination of strategy

    If you set this Release Indicator You can Change the Po after Release in ME22N and It wont Ask for New Release Strategy.

    3 Changeable, new release in case of new strategy

    If you set this Release Indicator You Can Change the PO after Release but Again it will be Subject to Release Strategy. You should release the same po again.

    4 Changeable, new release in case of new strat. or val. change

    5 Changeable, new release if new strategy/outputted

    6 Changeable, new rel. if new strat. or value change/outputted

    Changeable, new release in case of new strategy

    If you set the above Release Indicators You can Change the PO after Release but Again it will be Subject to Release Strategy as per the Changeability Values Settings.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 08:50 AM

    Hi

    Specifies whether the purchasing document can be processed in or is blocked for follow-on functions.

    1 Cannot be changed

    2 Changeable, no new determination of strategy

    3 Changeable, new release in case of new strategy

    4 Changeable, new release in case of new strat. or val. change

    5 Changeable, new release if new strategy/outputted

    6 Changeable, new rel. if new strat. or value change/outputted

    Changeable, new release in case of new strategy

    Raju

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.