Hi Gurus,

I was created process order, in that some materials are shortage, System showing what are the missing parts.

it is also not allowing to release.

But, it is allowing to save without release.

My problem is System should not allow to save, if there is missing parts.

How to restrict this.

Can anybody help me in this.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 07:03 AM

    Hi Anand,

    Check the customization of "scope of check" in the availability check section. Availability check may take into consideration not only unrestricted stock.

    Transaction OPJJ.

    Pay attention to the resolution of this definition - checking group from material master and checking rule from your activity.

    Thanks and reagards

    E.Rambabu

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 18, 2008 at 06:42 AM

    Dear

    You control these through OPJK - order control, There two options availalble 1- During order creation and 2 - During order release

    There selelct your plant and order type combination , Inside assign your checking rule and in the collective conversion option choose option 3 (No order creation if material is missing)

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 06:45 AM

    Hi

    Edited by: Ratan on Dec 18, 2008 12:19 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 18, 2008 at 06:47 AM

    Hi anand,

    If system will not allow you to release the Order in case of Missing Parts that means Configuration for Order Control ( OPJK) for transaction type 2 (Order release) is maintain.

    Now if you want to not allow order creation in case of Missing Parts then you have to maintain same Order Control in OPJK for Transaction type 1 (Order Creation) also.

    Regards,

    Dhaval

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.