How to transfer storage location from material master to Bom and from BOM to production order automatically.
Dear Mayuresh,
As I have mentioned in my earlier reply,
1.First priority will be given to the Prod.Storage location mentioned for individual component in the BOM
double click on the item number->status/long text tab key->there you can find a production storage
location.
2.IF it's not maintained in the the BOM,then it picks from the value maintained in the MRP2 view.
3.In case of REM,there's one more way of mentioning this Issue storage location.
This you can find under production version pop up screen,
FYI,
Proposed issue storage location for components
The proposed issue storage location is used in Repetitive Manufacturing
for components for which no issue storage location has been maintained
in the BOM. The goods issue of the components are then posted from this
issue storage location.
Dependencies
If you want the system to use this proposed issue storage location in
MRP and in the Repetitive Manufacturing backflush for withdrawing the
components, you must make the necessary settings in Customizing for
either MRP or for Repetitive Manufacturing. Here, you must define the
storage location determination strategy, Only assembly per MRP group by
entering the indicator 2 in the ISLoc field.
You use this procedure when all components lie in one storage location
together close to the production line where they are required.
Check and revert back.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In material master MRP2 view you can give the storage location. Also in the BOM item details screen>Status Long Text tab you can give the storage location
The storage location mentioned in BOM will be copied to production order automatically. If this is not maintained then it will copy from material master.
If storage location is maintained at both places, the one maintained in BOM will take precedence.
Regards,
Prasad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If you maintain issue storage location in the material master in MRP view, it gets copied to production order automatically.
If you want to overwrite this value at a BOM level, you need to maintain different one at BOM level.
If the BOM issue storage location is maintained it takes precedent otherwise Material master value takes prececent and gets copied to production order.
cheers
Rav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.