May 23, 2018 at 08:49 AM

Why is Production Order Scheduling Fixed at Start Today

92 Views Last edit May 23, 2018 at 01:51 PM 3 rev

Hi all,

For some materials we are having the issue below in which regardless of when the demand for the material is scheduled from its parent material, the production order can only be created with a start date of today even with backwards scheduling. This is the same regardless of how the production order is created.

In the scenario below, a planned order required for completion December 2019 is converted and without any changes to the scheduling is forced to a start date of today.

Can anyone advise what controls this?

Many thanks,

Dan

Attachments

capture.png (29.1 kB)
capture.png (12.3 kB)