HI,

i want to migrate the Work center master Data and Routing master data thru ALE,

i didnt get any Process code and message type for those.

which is the best process to migrate Work center and Routings Master Data...

Reply me ASAP,

Regards

Satya

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 07:06 AM

    hi

    u can go for LSMW for migrating WORKCENTRE and Rate routing

    for uploading work centre the details r given below.

    Object 0260 Work center

    Method 0000

    Program Name RCRAPDX2

    Program Type D Direct Input

    for Rate routing:

    Object 0170 Routing

    Method 0001 Batch Input

    Program Name RCPTRA01

    Program Type B Batch Input

    regadrds

    raghu..

    Edited by: Raghuveer Puram on Dec 18, 2008 9:23 AM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 17, 2008 at 02:14 PM

    you can use LSMW batch input method.

    Object 0170 Routing

    Method 0001 Batch Input

    Program Name RCPTRA01

    Program Type B Batch Input

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.