I have Created a material of type fished product as shown below with strategy 50
then I created is BOM and routing and now I assigned requirements on it through MD61
as shown below
and then I run the MRP through MD02
but the result as I understand should be an nonconvertible planned order of type VP but the case is that it shows the result planned order of type LA which can be converted to production order