User Exit on MD01 / MD02

Hi,

I am looking a user exit on MD01 or MD02.

My requirement is that my batch size of the product is 100Kg. if the requirement comes more than 50 only i want to get Planned Order.

In short Stock is 0 and I have given PIR for 100. When i run the MRP Planned Order gets generated for 100. Planned Order -> Prod Order -> GI -> Cnf -> GR for 90.

When i do GR for 90. My stock has come to 90Kg.

Again if i run the MRP Planned order is getting generated for 10Kg (Balance Qty) if the lot size is EX. if the minimum lot size is 50, planned order for 50 will be generated. Which i dont want. System should not consider the requirement as Demand.

When MRP run system will do net calculation. When it does the netting if the net Quantity is more than 50. Then only system should consider the particular material for MRP.

If any one have the user exit / Enhancement with coding, Please suggest

Thanks

Nag

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 10:15 AM

    Hi,

    You can have the desired exit by following way :

    Go to SMOD ---> Select F4 help -> Select SAP Component option-> Select component as PP- MRP and try to search required exit.

    HOpe this helps.

    Regards,

    Tejas

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 19, 2008 at 10:00 AM

    Hello,

    Try using this exit.

    M61X0001.

    Thanks,

    Jagmohan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      It would be very difficult for you to achieve this via user exit.

      Check for underdelivery tolerance in the PO and make it as 0% . In that case if you had done the GR for 90, system will leave a PO open for 10 and no Planned order will be created.

      If this not acceptable, you may have use reorder point with external demand considered and set the reorder point above 50.

      cheers

      Rav

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.