Quality Management-Inspection Plan creation date to be changed.

Hello,

The Materials Master is created on 30/06/2006.

The linked inspection lots have been created on 01/01/2008.At the time of allocation of routines and quality levels, the system is no longer coherent, and does not find the specified QM attributes.

Blockage during inspection on receipt, the system no longer finds the allocations to inspection lots if the creation dates of the routines are after the dates of creation of the materials.

Need to correct the creation dates of the inspection plans in Mass Maintenance.

Can you any one tell how to change the Creation dates of Inspection plan in Mass Maintenance.

Please guide me in this

Regards

Sarin

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 15, 2009 at 11:52 AM

    closed

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.