Skip to Content
author's profile photo Former Member
Former Member

How to get the Change node in Production Server!!!!!

Can anyone let me know how to get the Change Node for the Transaction Code Pe03 for the feature 40ack for generating the acknowledgent no in Production Server.

Plz let me know the steps.....

Regards

Ansuman Mohanty.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 08:19 AM

    Dear User ,

    In Production server cahnges are not allowed and recomenmded , transaction PE03 is to access Features , if you need teh access then you can asked to basis team for teh same in ( Cross Client mode )

    Regards

    Mini Arora

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 22, 2008 at 08:27 AM

    do that one in DEV and tranport it into Production check se10 to tranport request

    u cannot do any changes or setting in prod

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 22, 2008 at 09:32 AM

    THANX.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.