Skip to Content
0
Dec 14, 2008 at 10:11 PM

Impact on SRM4 and CCM2 on upgrade of backend to ECC6

10 Views

Hi all! I have been trying to find out what needs to be done (such as patches to be applied) to the SRM and CCM sysem if we upgrade the backend system from ECC5 to ECC6. I understand that we will need to check and change the configuration in SRM to point to the correct backend system type if required. However, I do not know of any other actions required to ensure that SRM still works properly after the backend is upgrade to ECC6.

Appreciate if someone can share their experience on this. Will also be good if someone can point me in the right direction as to where to look for such information. I have looked in the SAP upgrade site but could not find anything specifically on this.

Cheers!

SF