Dear All
As per my business process i need expiry and retest date one day before from the Mfg date.
Fo that i have maintained the data in remaining shelf life /Maximum shelf life/Total shelf life and inspection interval in MM.
I.e If mfg date : 12.12.2008 and based on stability i need recurring inspection after 1 year and want to keep expiry as 3 year.
data maintained in MM as
MM Date appear in MSC2N
Inspection interval : 364 days 11.12.2009
Remaining shelf life : 1094 12.12.2011
Maximum and total shelf life : 1095.
My requirement is, expiry date shall update as 11.12.2011 insead of 12.12.2008
AYK