Hi everybody!

I'm trying to use the Availability across Plant functionality described at the end of the page in the following link:

http://help.sap.com/saphelp_erp60_sp/helpdata/en/6b/2785347860ea35e10000009b38f83b/frameset.htm

But when I execute the ATP the "Other Plants" options appears in grey and I can't select it. I have created the material in every plant of the company (and there is stock in the store). The material is make to stock and the availability check is active in the schedule line. What have I missed? What have I to do in order to active this functionality?

Thanks!!

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 18, 2008 at 12:08 PM

    The reason why the function other plants is not active is that I use a material with plant specific configuration (See MRP 3 on material master). This function is only available if the material is not configured on plant level.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.