cancel
Showing results for 
Search instead for 
Did you mean: 

Availability Across Plants

Former Member
0 Kudos

Hi everybody!

I'm trying to use the Availability across Plant functionality described at the end of the page in the following link:

http://help.sap.com/saphelp_erp60_sp/helpdata/en/6b/2785347860ea35e10000009b38f83b/frameset.htm

But when I execute the ATP the "Other Plants" options appears in grey and I can't select it. I have created the material in every plant of the company (and there is stock in the store). The material is make to stock and the availability check is active in the schedule line. What have I missed? What have I to do in order to active this functionality?

Thanks!!

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

The reason why the function other plants is not active is that I use a material with plant specific configuration (See MRP 3 on material master). This function is only available if the material is not configured on plant level.