Hi All,

I have a scenario, whereby whether should there be a scenario to receive actual data from ECC6 or from BI.In another, my point is BPC gets data from BI 7.0 instead of ECC 6.0, will this be a good strategy or directly from ECC 6.0. if it is directly from ECC 6.0 what is the rationale ?

But BPC get data from BI 7.0 is there an advantage or disadvantage ?

I'm looking at Budgeting data

In case of extract actual data from BI to avoid getting different result between BI, BPC and ECC 6.0 to avoid data inconsistency

Currently our design is to extract actual data to ECC6.

Please advise