Dear experts,

I have created one order with a component of requirement quantity 1.Total unrestricted quantity available for this material is 1 no. so this component is committed to my order. now, i made second order with same component of requirement 1 no. so it gave MSPT material shortage to me.

Now I deleted the component from 1st order & saved. Again I opened the second order in change mode and saved the order. as per my setting it is supposed to check the material availability while saving the order and should have committed the deleted quantity of first order to second order. But it didn't. It committs only if I check it manually. What may be the problem in my settings? My settings are as follows,

In material availability check-->inspection control --> order control settings for business function 1, I have checked the box for check material availability during save, checking rule PM, check component check type ATP and

for business function 2, I have checked the box status check , checked box for check mat.availability during save,comp.check type ATP.

Please do the needful

Thanks and best regards,