For MTS REP MANF with strategy 40-planning with final assembly and MRP type-PD In SPRO
for scheduling and capacity parameters in (opu5) how to specify the floats for deteriming the BASIC DATES of planned order,and what are the parameter required to determine the BASIC DATES in spro
and what are the scheduling parameters required to maintain planned order say ORDER TYPE -PE
RUN SCHEDULE(PLANNED ORDER-PE) and ORDER TYPE-LA STOCK ORDER