For MTS REP MANFwith strategy-40 planning with final assembly and MRP TYPE-pd. In spro planning,
for MRP CALCULATION,planning horizon for each plant if i maintian planning period-PIR for a material
for aperiod of 3MONTHS do i want to consider saftey stock during planning run,and which availability
of stock in transfer/blocked/restrictedstock i want to maintian and in range of coverage profile,to deterime saftey stock based on requirement and range of coverage Which coverage profile and requirement i want to maintain and in LOT SIZE CALCULATION which LOT SIZING PROCEDURE i want
to maintain