Hi gurus:
I have a problem in MTO materials.
There're two finished products A and B using MTS production (planning strategy group is 40). they have the same component G which is row material. I have already set the Individual and Collective indicator as 1 in the material master record of A and B.
Now the question is, after running MRP, the component G always generates in collective requirement, and never generates individually.
had tried by assigning explosin key ( Switch off from Coll. to indvidual) to BOM component G in A and B. But the result is same as collective requirement.
I search the answer here and other websites on the internet. But I can't solve it.
Can you do me a favor?
Thanks very much.
Paul