Hi,
I have define a Material (20) as phantom assembly in Material master. I have created a BOM with Material (10). in the Bom I 've put one Position with the phantom assembly (20). the phantom assemble gets 2 components (30 and 40) in another BOM.
My problem is: In the Routing when I look in the component overview I see the phantom assembly material.
Normaly I muss see the component from the phantom assembly and not this phantom assembly (20).
When I run the MRP MD02 I don't get any requirements for the components (30 and 40)
Have I done somthing wrong? or how can I do for this problem.
Thanks
Dede