on 12-06-2008 12:52 PM
Hi.
How can I know whether PI is ready to run?
ex)
MMC status is green.
J2EE Engine status is "10"(RUNNING)
http://<host>:<port>/AFW/rtc returns some status
I want to check the whether PI is ready to run periodcically.
Can I use sapcontorl interface?
regards,
How can I know whether PI is ready to run?
Check SAP Note 817920.
Regards,
Prateek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
For Periodic run you can schedule your Adapter.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If all the instances,java,abap are up in SAPMMC then PI is ready to work.
thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Gaspard,
>MMC status is green.
>J2EE Engine status is "10"(RUNNING)
> Check the ABAP Stack
If all this good, PI is ready to go ahead
Cheers
Agasthuri Doss
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.