Skip to Content
0
Former Member
Dec 05, 2008 at 02:08 PM

Mass upload of Master Recipe - BDC

582 Views

Gurus,

We are uploading Master Recipes through BDC program. I am creating a new master recipe with reference to the existing material. (copy option)

I am able to sucessfully complete Operations and Production Version definition but i face problem during the assignment of materials to the phase.

I have multiple operations and phases and also there are asignment of materials to all the phases.

Please help me out on this and revert if any other information is required.Solutions / Suggestions to this issue is highly appreciated.

Note: If I select 10 materials during recording I am able to assign only for the 10 materials.

But in real case the number of materials is variable than the recorded.

Thanks,

Aravind