Hi Gurus,

I have created a planning Scenario - 999, for plant 1000.

In OPU5, i have entered the scenario.

Created a reqirement in MD61 with version 01(in active).

In MS32, in the Planned Independent requirement tab,I have entered "01" in the versionfield & "00" in the target version field. (IAM NOT SURE WEATHER IAM RIGHT HERE, PL. CORRECT ME IF IAM WRONG).

Created planning file entries.

executed MS02

checked MS04.

I could not see any required capacity in CM38

Am i failing somewhere? pl. help.

regards,

K.Kumar.

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Kumaran,

1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario

configuration settings has to be made in OPU5 for the planned orders for LTP.

2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements

kindly remove the tick mark against version- active check box.

3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are

entered or created,the same can be checked using MS21.

4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated

planned orders obtained in MS04 T code.

5.These Simulated planned orders can't be converted into production orders or it cant be used for any

business confirmation purpose.

6. For capacity planning analysis,use T Code CM38,

Before that Ensure for all the work centers in CR03 which are used for operation under capacity header

you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity

requirements data.

7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.

Revert back incase of any more clarifications required.

Regards

Mangalraj.S

Former Member
0 Kudos

Many thaks Mangal.

Everything is working fine.

Before closing his thread, pl. let me know , in MS32, after releasing, i could see one tab by name "Activate Independent Requirements". What is the purpose of this tab?

regards,

K.Kumar.

former_member184655
Active Contributor
0 Kudos

Dear Kumaran,

This only a guess,since I have not used that option so far,When you want to activate that inactive

version requirements you can mention the source version (in active version) and the target version say

00 (To active version) .again there's test mode to check the execution and a create List mode.

Also check T Code MS64, to copy the requirements data from one version to another version.

So is your previous issue solved?

Revert back still if you have any queries.

Regards

Mangalraj.S

Former Member
0 Kudos

Mangal,

I have closed the thread.

I activated one of the version through that tab & executed MRP(MD02). I could see all the requrements were got transfered here.

regards,

K.Kumaran

Answers (4)

Answers (4)

Former Member
0 Kudos

This message was moderated.

former_member205751
Participant
0 Kudos

hi mangal

in the first place i would be happy to know from you what is the purpose of LTP when all other methods are there..i need to explain to my client coz as of nw he is using MRP alone..he asks for SOP and LTP

for REM purpose

Former Member
0 Kudos

Hi

In LTP run MS02 screen, please ensure scheduling key is 2 (Lead Time scheduling).

Thanks,

JK

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

RUN MRP with lead time scheduling.

In work center capacity tab work center should mark for finite scheduling and Log term planning.

In CM38 and check the evaluation period and selection profile?

Check result in CM01 for capacity generation?

Regards,

R.Brahmankar