Skip to Content
0
Dec 04, 2008 at 07:15 AM

Job scheduling for different slection criteria

18 Views

Hi,

I have a selection screen where user can select eg. say operation 700 or 800 (radiobuttons).

Now user want to schedule the report as background job.

Is that I need to create two jobs with two variants ( i.e for two operations 700 & 800)? So that user executes job with respective variant for the operation.

Pl. clarify whether above steps are of right approach. Also any alternative ways to achieve the same.

Thanks.

From

Reddy