Missing Parts in Rem.

Former Member
0 Kudos

Dear Friends,

How to handle Material Availability checks in Repetitive Manufacturing

If Missing Parts is there no Backflushing is allowed.

Regards,

Jimmy

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member184655
Active Contributor
0 Kudos

Dear SDN Creature,

In the REM Profile in T Code OSP2 - under control data 1 include the check box for Execute correction

in dialog mode and select the radio button for Mandatory.

If you are assgning this REM profile to the FERT or HALB materials while doing the backflush if there is

any deficit of components,then the syetm will now allow to do the confirmation.

There's no other check for missing parts in REM.

So check with this & revert back if there is any queries.

Regards

Mangalraj.S

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

I'm not sure but pls try this maintained stock determination rule and stock determination group and assign to the remin config. and maintained stock determination group in material master

For details refer this SAP help.

http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aab64adc11d189740000e8322d00/frameset.htm

Regards,

R.Brahmankar