Dec 03, 2008 at 03:55 AM

material move one storage location to other with inclde freight

58 Views

1> I want to transfer material from one storage location to another storage location. But both storage locations are at different locations. I can move material one storage location to other, here my problem is, I need to include freight charges, on material account, after I transferred from one storage location to other. I know in storage location level, material is valuated quantity basis, not value basis. But how to overcome above scenario.

Ex

Storage location one- SLO1

Storage location two- SLO2

Move 10 quantities from SLO1 to SLO2 (cost of each quantity is 10 rs)

Freight charge u2013 75 rs

How to include freight charge 75 rs in material cost