Hi All
On my Costing Estimat,I am getting a multiplied version of the actual Cost - the system is multiplying the cost by EA everytime whereas, it should be a singel cost -
for instance, the General and Material OH which I have defined as Quantity Based Overhead Rates and specified an Overhead Key (Stock)
How do I rectify this issue
Thank u for the support
Rukshana