Hi Friends
I have a peculiar situation. ROH purchased in KG but issued in pieces to shop floor.
Now these pieces get rejected on shop floor after 2-3 operations and have to be
returned to vendor. We will charge the vendor for process lost also. ROH is excisable.
1 ROH makes 3 pieces and this piece we consider as HALB and has a diff part code.
After every operation part code changes and this HALB is part of a BOM
How to map this scenario?
Thank You