Hi.
in my business process for manufacturing one finished product.it needs 2 operations. in the first operation there are 4 raw materials. the first operation produces a material x. and this material x goes in to the 2nd operation and and there the material again under goes some manufacturing. there are four more raw mterials involved in the operation.I get my finished product there.but my business wants to track material x. which is a non stock material. it gets manufactured in operation 10 and gets consumed in operation 20. how to track this material.
so will this bom be a multi level bom, lower level to manufacture material x and higher level for manufacturing the finished product.