Hi Experts

i have one product that we can produce in 2 resources theni have on my optimizer profile on the configuration of discretization on the Horizon production with the value 4 and the in the master data type source production i have 50 of minimum lot sizing and 60 of maximum lot sizing and the rouding value of 3.

when we ran the optimizer the rouding value was not taked in count

does any have any idea to fix it?

Best regard

Jorge