on 12-02-2008 9:48 AM
Hi Experts,
Please give me complete cycle details with steps for Process orders.
from order creation to order settlement.
Regards,
Vivek
Thanks Brhamakar for your invaluable inputs.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please refer to link below:
http://help.sap.com/erp2005_ehp_03/helpdata/EN/05/603bc6462311d182b50000e829fbfe/frameset.htm
Process order creation
Selecting a master recipe
Creating reservations or copying them from planned orders
Calculating planned costs
Creating capacity requirements for the resources
Scheduling
Starting with the basic order dates, the system automatically schedules the process order when you create it. In addition, it can later be rescheduled automatically or manually whenever changes relevant to scheduling have been made.
Release of process order
Process order execution and process management
Creating and downloading control recipes (optional)
Printing shop floor documents
Carrying out material withdrawals
Withdrawing material components required in the manufacturing process in the form of goods issues from the warehouse.
Recording confirmations
Carrying out in-process quality inspections (optional)
Posting goods receipts
Delivering the manufactured product to the warehouse by posting a goods receipt.
Thanks,
Samuel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks Samuel,
Please help me in this regards too.
I have completed the goods reciept step for a process order.
Now I am trying to do the following steps for the order settlement.
1.Calculate Overheads using Tcode : KGI2 - Individual Processing
CO43 - Collective Processing
2.Calculate WIP using Tcode : KKAX - Individual Processing
KKAO - Collective Processing
3.Calculate Variance by using Tcode : KKS2 - Individual Processing
KKS1 - Collective Processing
4.Finally do the settlement of Order in Tcode : KO88 - Individual Processing
CO88 - Collective Processing
I am not able to do these steps.
KGI2: the screen is appearing without any details,but there is no error message.
KKS2: Here all the cost are coming zero.
KO88: I am getting this message: There are no accrued amounts; settlement is not possible.
Please advice.
Regards,
Vivek
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.