subcontracting issue

62 Views

Hi,

MRP is run and planned order is converted to Prodcution order of finished say 'A". it has one raw material say 'C'.

opeartion 0010 cutting

operation 0020 milling .

client says after cutting is over, if required they should be able to send the milling operation to be done by outside vendor.

Now if I suggest my client to change the material code say so thjat A is made of B and then B is made of C.

So how to proceed ahead. first operation done , only cutting operation is done. If I do GR at this stage this will go to storage location with material number A but milling is still not done!

If i am changing the material code what to do with the current Production order because this production order says A is made only after 0010 and 0020 operations are done. GR cant be made with material code B because production order is for A!

scenario will differerent in case before start of opeartion 0010 they decide for 0020 milling to be done outside.and next scenario is when after 0010 is done , now they want to do 0020 milling opeartion outside.

Please reply.

Regards.