Dear All,
I have the following problems:
I have to start a Euro conversion in my SAP R/3 system (4.7 on Linux/Oracle) and this conversion is made by different batch processes running with different Job Class value. The full conversion takes about 13 or 14 hours.
In order to prevent lock problems, I need to find a way to put in u201Choldu201D all the other batch jobs not related to this Euro conversion.
I mean, I know that is possible to put a batch job from Release to Scheduled, but after the Euro conversion I should re-schedule one by one all the jobs.
Do you know if something like that exists?
Thanks,
Federico Biavati