Hey gurus,
I want to create a counter based plan for a prt. Scenario is that the prt is to be replaced after every 100 strokes. now the time period of the strokes is not fixed. Like the 100 strokes can be completed within a week or in a day or in 2 days. As far as i ve tried i ve created a counter based maintenance plan based on a rough annual estimate but have to call it manually after scheduling the plan. Can we do it in some other way?