Skip to Content
0
Former Member
Dec 01, 2008 at 12:51 PM

MRP

37 Views

Hello,

Can I run MRP on a storage location level? or on MRP Controller?

I tried creating an MRP Area with Type storage location and activated it, but all the fields that allow MRP AREA entry are single levels and I have to define the material.

Thank you